HomeMy WebLinkAboutResolution 15-027-CC BOARD OF COUNTY COMMISSIONERS
Grant County, Washington ��
� ° . �Fl�.
�' �,.. k
�� l�
� �M:�'.�'A-Ky.�..`�..�.
:;�y.n+++ac�soi'�.rs.xy�',-?�
IN THE MATTER OF AMENDING �
THE 2015 ANNUAL ROAD Resolution No. JS - � a 7—�
- CONSTRUCTIOI�1 PROGRAM �
WF�EREAS, pursuant to the requirements af R.C.W. 36.81.130 and W.A.C. 136-16-010
the Director of PubGc Works/ County Road Engineer submitted a recommended Annual Road
Construc�ion Program for 2015 to the Board of County Commissianers on September 30, 2014;
and
WHEREAS, the Board of County Commissioners had reviewed the recommended
program for 2015 and had made the revisions and changes deemed practicable to the County's
long range road program; and
WHEREAS, pursuant to the requirements af R.C.W. 36.81.130 and W.A.C. 136-16-018
the leg+slative authority adopted a final Annual Road Construction Program on the 25�' day of
November, 2014, prior to adoption of the final budget, and made effective on the 15t day of
January, 2015,
NOW, THEREFORE BE IT RE�� I Ro�ad �ons Buct on P ogram be amended as shownnt
County, Washington, that the 2015 An
EFFECTIVE DATE: ✓�2 , 2015
Da af_ '�d�"c/� , 2015.
DATED this � / ° � Y
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY,WASHINGTON
Yea Nay Abstain
� ❑ Q - �
' hard Stevens Chair
�
lJ ❑ � �
TfEST: Cindy Ca r,Vice-Chair
��.�
B rbara J.Vas ez � � � Caro4ann Swartz, Member
lerk of the Board "
ANNUAL CONSTRUCTION PROGRAM FOR 2015
TOTAL$S WAC 136-16 AGENCY ACTION: couNnr» Grant
(A) TOTAL CONSTRUCTION PROGRAM -columns(14)+(15) $7,972,000 DATE RECOMMENDED PROG.SUBMITTED 3
(B) PUBLISHED COUNTY FORCES LIMIT(see instructions) $1,305,321 DATE OF ENVIRONMENTAL ASSESSMENT 7/2/2014
(C) TOTAL COUNTI(FORCES CONST PROGRAM-column(15) $753,000 DATE OF FINAL ADOPTION 11/25/2014
ORDINANCE/RESOLUTION NO. 14-067-CC
'"* Line (C) must be smaller than Line (B) "''� DATE OF AMENDMENT 3/24/2015
(1) (2) (3) (4) (5) (6) (7) 8) (9) (10) (11) 12 13 14 15 16
� � ESTIMATED EXPENDITURES-
� v = � � ¢ � SOURCES OF FUNDS DOLLARS
m � � o ROAD/PROJECT NAME w � Z o W W DOLLARS
� O z ROAD AND LOCATION O z O � O � � COUNTY OTHER FUNDS • RIGHT CONSTRUCTION
z � a W LOG � � U v Y O W FUNDS CONST. OF GRAND
w � � ~ No. (Include brief termini description � � � � AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL
~ � or MP's; Bridge#) (Miles) �` � W a SOURCE 595,10 595.20 CONTRACT FORCES ALL 595.
Varies Previously adopted 2015 Annual Construction Program - Vr - 3,637,547 5,158,453 Various 929,000 2,000 7,209,000 665,000 8805000
Date of Adoption: 11/25/2014-Resolution 14-067-CC Sources
Varies Previously adopted Amendment to 2015 ACP 0.00 Vr - E -793,000 868,000 Various 117,000 -30,000. 88,000 175,000
Date of Adoption: 1/20/2015-Resolution 15-005-CC Sources
25 15 94025 STRATFORD RD GRIND/INLAY(ML City Limits to Tyndall) 3.32 07 D E 44,000 282,000 STP(US)- 5,000 25,000 30,000
MP 1.11 to MP 4�43 STP(R)
HMA Grind/Inlay(2"); Finished Width=34-52 Ft.
26 16 45170 PATTON BLVD GRIND/INLAY(SR 17 to Craig) 1.60 14 D E 4,000 26,000 STP(US) 5,000 15,000 20,000
MP 0.00 to MP 1.60
HMA Grind/Inlay(2"); Fin.Width=48-60 Ft.
CRAB FORM #3, REVISED 06/09 1 of 2 Annual Const Prgm 2015 Amend 3-24-15
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) 12 13 14 15 16
�
� ESTIMATED EXPENDITURES-
� � � _ � � ¢ �— SOURCES OF FUNDS
w V �— w � z DOLLARS ;
m � � o ROAD/PROJECT NAME � � z � W W DOLLARS
= W � z ROAD AND LOCATION � W o u�i O � � COUNTY OTHER FUNDS • RIGHT CONSTRUCTION ;
z } a W LOG o- � U g V p W FUNDS CONST. OF GRAND
g � � F U Y
F o - N0. (Include brief termini description � O � � AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL
� or MP's; Bridge#) (Mlles) � W a SOURCE 595.10 595.20 CONTRACT FORCES ALL 595.
�
'I
This Page Intentionally Left Blank ,
�
i
;
i
i
I
i
'
I
�
�
i
i
I
i
�
;, �
PAGE/PROGRAMTOTALS,CONSTRUCTION 2,592,547 6,334,453 0 1,056,000 2,000 7,219,000 753,000 9,030,000 �
CRAB FORM #3, REVISED 06/09 2 of 2 Annual Const Prgm 2015 Amend 3-24-15 i