HomeMy WebLinkAboutResolution 15-005-CC li�
TY
CUIVI1V11SS��NE�s -;#
� ,.
Ol�� n
� o
t
QF in � �.�
B�p'R� Grant Cc�untY,V�►ash 9 _.
� ,���${W,.��;.
��
_��,��r���„
,� pS — C�
IN THE MAnER OF
�Eg�DING Resolution N�� �`� � �
THE 2 TRUC ON PROGRAM
CONS
36.8'�.130 and W.
p�_e, 136-16-010
C�W� recommended Annua�2Q 14�
uiremenfi.s of R. Se {ember 30,
WHEREAS, pursuant to{he r�Road Eng►n�er s Co m ss oners on t�
orks 1 Coun�Y
o ram f4r 2015 to the Board af County
the Direc�or o Pu��fc W
ended
Construct�Qn Pr g �acticable to the county's
and C�mmissioners had r e���p the recom
the rev�sio�S a�d changes de
WHEREAS,the B���eCounty
�rogram for 2015 anc�h W.A.C. 136-16-01$
rQ ram; ��d 3�.,g1,130 and of
long range road p 9 C.W. on the 25 day
uireme�{s o�R- e{{ective on the 1S�day of
ursuant t°the req Con�ma oen Pro9ram
W�1EREu ho ty a�°pted a final AnnuaE����
the tegislative a
rior ta ado��►on °f�he fE�►a�budget� a
November, 2p14� � Gom►�►issioners s�wp
,lanuarY� 2fl�5' b the Board of Goun� �e amei�ded as
BE IT RES4L�JED Y
pW,THEREF��� 2015 An�u�'�Raad Construction Pro�ra
N �o�,that the
County,�Nashing
� , ,2015
EFFECTNE�A1E� —' ,2015.
� �
�/� pay of
thts l�
DATED COM�iSS��NER
��ARp pF COUNTY WASH�NGTON
G�NT COUN��
Yea Nay Abstain
� �
� ichard Steve ,Cha
,1�'�
� ❑ Ca er,Vice-Chair
❑ Cindy �
E.SY. Member
� ❑ � Carotann S`Na�Z'
arbara J.vasa�ez
Cl rk ofi the Board
ANNUAL CON�TRUCTION PROGRAM FOR 2015
rora���s WAC 136-16 AGENCY AGTION: couNTY» Grant
(A) TOTAL CONSTRUCTION PROGRAM-columns(14)+�15) $7,932,000 DATE RECOMMENDED PROG.SUBMITTED
(B) PUBLISHED COUNTY FORCES LIMIT(see instructions) $1,305,321 DATE OF ENVIRONMENTAL ASSESSMENT 7/2I2014
(C) TO7AL COUNTY FORCES CONST PROGRAM-column(15) $753,000 DATE OF FINAL ADOPTION 11/25/2014
ORDINANCE/RESOLUTION NO. 94-067-CC
"`* Line (C) must be smaller than Line (B) '"* DATE OF AMENDMENT 1/20/2015
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) 12 13 14 15 16
� ESTIMATED EXPENDITURES-
� � ¢ SOURCES OF FUNDS
� � � o ROAD/PROJECT NAME ,�w� � Z o z W DOLLARS DOLLARS
� O z ROAD AND LOCATION O z O � O � � COUNTY OTHER FUNDS • RIGHT CONSTRUCTION
Z d W LOG d J U g V o W FUNDS CONST. OF GRAND
w � o ~ NO. (Include brief termini description LL U O j � AMOUNT PROGRAM ENGf21NG WAY COUNTY TOTAL
� or MP s, Bridge#) (Miles) � W ¢ SOURCE 595.10 595.20 CONTRACT FORCES ALL 595.
Varies Previously adopted 2015 Annual Construction Program - Vr - 3,637,547 5,158,453 Various 929,000 2,000 7,209,000 665,000 8805000
Date of Adoption: 11/25/2014-Resolution 14-067-CC Sources
20 50 30330/ BRIDGE#353, R-NW at MARTIN RD 0.21 09 ABCI E 94,000 6,000 88,000 94,000
93025 MP 0.01/1.93 to MP 0.12/2,03
Bridge Repl-22 LF,Approaches(BST): Finished Width=28 Ft.
21 36 92035 U-SE RD.OVERLAY 3.28 07 D E 152,000 974,000 STP(R) 25,000 1,126,000 1,151,000
MP 0.00 to MP 3.28
HMA�verlay(3"); Finished Width=32�t.
09 9 91017 ADAMS RD. NW (SR 28 to Bridge#330) 1.86 08 ABDI E -39,000 -1,031,000 RAP -39,000 -1,031,000 -1,070,000
MP 23,68 to MP 25.54
Grand, Drain,Surface(HMA 3"-two lifts); Fin.Width=28 Ft.
Bridge Replacement
15 15 30400 MARTIN RD. NW&BR#328 (Adams Rd.to H-NW) 5,13 08 ABCI E 150,000 750,000 RAP 75,000 900,000 975,000
MP 7.32 to MP 12.45
2R,SurFace(BST), Bridge Replacement; Fin.Width=28 Ft.
22 52 Varies COUNTY RD SAFETY:2015 RPM's,Rumble Strips, Flash.Signs - Vr G E 27,000 HSIP 27,000 (PE Only) 27,000
Recessed Pavement Markers, Rumble Strips,and Flashing
Stop Signs.
23 53 Varies COUNTY RD SAFETY:2015 Guardrail Safety Data Collection - Vr G E 41,000 HSIP 41,000 (f'E Only) 41,000
Existing Guardrail Data Collection and Anaylisis
24 54 Varies COUNTY RD SAFETY:2015 Horizontal Curve Signs - 09 G E 107,000 HSIP 107,000 (PE Only) 107,000
Install Horizontal Curve Signs on Local Access Roads.
07 7 94000 3-NE(O-NE to Q-NE) 1.88 07 ABD E -1,150,000 -125,000 (PE Only) -1,025,000 -1,150,000 ,
MP5.03toMP6.91
Grade,Drain,Surface(HMA-3"-2 Lifts)Fin.Width=34 ft.
' CRAB FORM #3, REVISED 06/09 1 of 2 Annual Construction Program 2015 Amendment
(1) (2) (3) (4) (5) � (7) (8) (9 (10) (11) 12 13 14 15 16
� ESTIMATED EXPENDITURES-
� � ¢ SOURCES OF FUNDS
m � � o ROAD/PROJECT NAME ' � Z � W W DOLLARS DOLLARS
� � � Z ROAD AND LOCATION � W � c�i� O � � COUNTY OTHER FUNDS � RIGHT CONSTRUCTION
� � Q W LOG a —' Z U Y p w FUNDS CONST. OF GRAND
� o — NO. (Include brief termini description � O � N AMOUNT PROGRAM ENGRING WAY COUNTY TOTAL
� or MP's; Bridge#) (Miles) � W ¢ SOURCE 595.10 595.a.0 CONTRACT FORCES ALL 595.
This Page Intentionally Left Blank
PAGE/PROGRAMTOTALS,CONSTRUCTION 2,844,547 6,026,453 0 1,046,000 2,000 7,179,000 753,000 8,980,000
CRAB FORM #3, REVISED 06/09 2 of 2 Annual Construction Program 2015 Amendment