Loading...
HomeMy WebLinkAboutResolution 14-067-CC' r S �, BOARD OF COUNTY COMMISSIONERS E ��� � ,;, Grant County, Washington � _��� } �. � ;. ,.�. {.��±r` i� St� qp.�(it bt,{p � � A9,i . � : IN THE MATTER OF ADOPTING f / THE 2015 ANNUAL ROAD Resolution No. �'7�' °Oc��r �� CONSTRUCTION PROGRAM WHEREAS, pursuant to the requirements of R.C.W. 36.81.130 and W.A.C. 136-16-010 the Director of Public Works/ County Road Engineer submitted a recommended Annual Road Construction Program for 2015 to the Board of County Commissioners on September 30, 2014; and WHEREAS, the Board of County Commissioners has reviewed the recommended program for 2015 and has made the revisions and changes deemed practicable to the County's long range road program; and WHEREAS, pursuant to the requirements of R.C.W. 36.81.130 and W.A.C. 136-16-018 the legislative authority shall adopt a final Annual Road Construction Program at any time prior to adoption of the final budget, NOW, THEREFORE BE IT RESOLVED by the Board of County Commissioners of Grant County, Washington, that the 2015 Annual Road Construction Program attached hereto is hereby adopted. EFFECTIVE DATE: January 1, 2015 DATED this f � Day of�_��� �`L�%C� , 2014. BOARD OF CDUNTY COMMISSIONERS GRANT COUNTY,WASHINGTON Yea Nay Abstain � ❑ ❑ �%2'��"� Car IAnn Swartz, C ir TTEST: [� ❑ � ' _ � 'chard Stevens,V' e-Chair arbara J. Va ue ][� ❑ �] Clerk of the Boar Cindy Car er, Member ANNUAL CONSTRUCTION PROGRAM FOR 20'f5 ror,a�ss 1fVQ,C 136-16 A��NCY AC�`I�N: couNrr» Grant (A)TOTAL CONSTRUCTION PROGRAM-columns(14)+(�5) $7,874,000 DATE RECOMMENDED PROG.SUBMITTED (B) PUBLISHED COUNTY FORCES LIMIT(see instructions) 51,305,321 DATE OF EM/IRONMENTALASSESSMENT 7/2/2014 (C) TOTAL COUNTY FORCES CONST PROGRAM-column(�S� $665,000 DATE OF FINAL ADOPTION 1'I/25/2014 ORDINANCE/RESOLUTION NO. ** Line �C) must be smaller than Line �B) ""' DATE OF AMENDMENT '1 2 3 4 � 6 8 9 10 11 12 '13 14 15 16 g -� ESTIMATED EXPENDITURES- � a �--x � � <� SOURCES OF FUNDS DOLLARS m ��p ROAD/PROJECT NAME W� Z o W W DOLLARS � W�Z ROAD AND LOCATION �W �� O �y COUNTY OTHER FUNDS - RIGHT CONSTRUCTION z >a W LOG a� c~i g U p W FUNDS CONST. OF 6R4ND w �o~ NO. (Include brieftermini description LL� � �y AMOUNT PROGR4M ENGRING WAY COUNTY TOTAL � O�MP's;Bndge� (Miles) � W a I SOURCE 595.10 595.20 CONTRACT FORCES ALL 595. � 01 1 32390 Br#1399(W-NW Railroad Cut) 021 09 GI 147,072 &10,000 BRS 125,000 707,000 832000 MP 021 to MP 0.31 74,928 BNSF Bridge Replacement,Guardrail: Finished Width+26ft. 02 2 09400 3NE ROAD SAFETY PROJECT�cinity af T-NE) 0.38 MP 9.71 to MP 10.09 Grade,Drain,Surface(BS�: Finished Width=34 Ft. 07 ABC E 54,000 329,000 STP(R) 10,000 2,000 38Q000 392,000 03 3 94025 STRATFORD RD_NE REALIGNMENT (BNSF)Gng to SR 28) 0.39 07 ABC E 32Q000 750,000 USBR 6Q000 975,000 35,000 1,07Q000 MP 2028 to MP 20.67 Grand,Drain,Surtace(BS'n; Finished Width=30 Ft. 04 4 21590 SAND DUNES RD.8�NEW BRIDGE (North Spillway) 0.10 09 ABCI E 250,000 Local 550,000 550,000 MP 6.58 to MP 6.68 300,000 SIP Grade,Drain,Surtace(BS"�; Finished Width=28 Ft. 05 5 20550 B SE RD. (SR 26 to 13-SE) 2_88 09 ABC E 69Q000 9Q000 400,000 200,000 690,000 MP 2.90 to MP 5.78 Gravel to BST Grade,Drain,SurFace(BS�; Finished Width=26 Ft. Priority 5 06 6 9104� R-SW RD(23SW to 24SV� 0.99 09 ABC E 207,000 12,000 195,000 207,000 MP 0.00 to MP 0.99 Gravel to BST Grade,Drain,Surface(BS�; Finished Width=26 Ft. Priority 7 07 7 94000 3-NERD_ (0-NEtaQ-N� 1.88 07 ABD E 1,175,000 150,000 1,025,000 1,175,000 MP5.03to MP6.91 Grade,Drain,Surtace(HMA 3"-two Iifts);Fin.Width=34 Ft. 08 8 91017 ADAMS RD.NW OVERLAY (SR 283 to SR 28) 6.32 07 D E 198,450 1,27�,550 STP(R) 7Q000 1,40Q000 1,47Q000 MP 17.36 to MP 23.68 OveAay(HMA 2'�; Fnished Width=34 Ft 09 9 91017 ADAMSRD.NW(SR28toBridge#330) �.86 08 ABDI E 114,000 1,031,000 RAP 114,000 �,031,000 1,145,000 MP 23.68 to MP 25.54 Grand,Drain,Surface(HMA 3"-two liRs); Fin.Width=28 Ft Bridge Replacement 10 22 4'1690 VALLEY RD_NE 8�AIRWAY DR.NE Qess Fairgrounds Frtage) 2.21 16 D E 100,000 625,000 STP(l� 25,000 700,000 725,000 Paxson(ML City Limits)to SR 17 MP 1.00 to 2.00(Valley) MP 2.05 to 326(Airvuay) HMA Overlay(grind&inlay);Fnished Width=50-60 ft '11 10 Various MISCELLANEOUS PROJECTS All ABC E 250,000 15,000 235,000 250,000 'fnGuding Cost Share Projeds 12 11 41550 COCHRAN RD.&OTTMAR RD. (Ainvay Rd.,to Valley Rd.) 0.89 17 ABDEF E 13,500 86,500 STP(U) 10Q000 (PE Only) 100,000 MP 0.00 to MP 0.89 Grade,Drain,Surface(HMA 3"-fivo lifts),Curb&Gutter 5 Ft Sidewalk both sides,Finished Width=28 Ft.&36 Ft - 13 '12 9�097 ADAMS RD.SW OVERLAY(SR 26 to Frenchman Hill Rd.) 6.28 07 D E 2,025 12,975 STP(R) 15,000 (PE Only) 15,000 MP 0.00 to MP 628 ' CRAB FORM #t3,REVISED 06/09 1 of2 Annual ConsWction Program 2015WORKING 1 2 3 4 5 6 8 9 10 11 12 13 14 � 16 � ESTIMATED EXPENDITURES- � a �x � � a r SOURCES OF FUNDS DOLLARS m ��Q ROADlPROJECT NAME w� Z � W W DOLLARS � W�z ROAD AND LOCATION �W �� O �N COUNTY OTHER FUNDS -& RIGHT CONSTRUCTION Z >a W LOG a J v g U p W FUNDS CONST. OF GR4ND w `�¢�— NO. (Include brief tertnini descrip6on �� � �� AMOUNT PROGRAM ENGRING WAY COUNiY TOTAL ~ � o�MP's;Bridge#) (Miles) � � W a I SOURCE 595.'10 59520 CONTR4CT FORCES ALL 595. HMA Overlay(2"); Finished Width=34 Ft. 14 14 b3050 J-NE RD.REALIGNMENT 0.72 09 ABC E 20,000 20,000 (PE Onty) 20,000 MP 0.00 to MP 0.72 Grade,Drain,Surface(BS�; Fnished Width=28 Ft. 15 '15 30400 MARTW RD.NW 8�BR�Ki28 (Adams Rd.to H-N1M 5.13 07 ABCI E 7,500 67,500 RAP 75,000 MP 7.32 to MP'12.45 �9 (PE Only) 75,000 2R,Surface(BS�,Bridge Replacement; Fin.Width=24 Ft '16 �6 '10591 U-SW RD.&23-SW RD.(24SW to 23-SW to SR 243) 1.61 09 ABC E 16,000 16,000 (PE Only) 16,000 MP 0.00 to MP'1.6'I Gravel to BST Grade,Drain,Surface(BS"n; Finished Width=26Ft Priority 14 17 17 13650 A5 SW RD. (12-SW to 13-51/� 1.13 09 ABC E 12,000 12,000 (PE Onty) 12,000 MP 0_00 to MP 1.13 Gravel to BST Grade,Drain,Surtace(BSTj; Finished Width=26 Ft. Priority 8 18 18 94046 20-NE RD. (Adrain Rd.to Stratford Rd.) 4.88 08 P,BC E 20,000 20,000 (PE Onty) 20,000 MP 4.38 to MP 926 Grade,Drain,Surtace(BS'n; Finished Width=28 Ft 19 11 94025 STRATFORD RD.SIDEWALK(SR 17 Vcto Maple Dc) 0.61 07 F E 4'I,000 Path S�Trail 41,000 4'I,000 (2015 TIB Funding Request) Joint w/Moses Lake,Grant Transit,WUTC) MP 0.89 to MP 1.50 Cona SW,ADA Ramps,Crosswalks,Signs,Fin.Width S6 ft PAGE/PROG�tTOTa.�S,CONSTRUCnON 3,637,547 5,'IS$453 O 929,000 2,000 7,209,000 665,000 8,80.5,000 -CRAB FORM#3,REVISED 06/09 2 of 2 Annual Construction Program 2015WORKING