HomeMy WebLinkAboutResolution 14-009-CC BOARD OF COUNTY COMMISSIONERS ��,P�T C°°,���
Grant County, Washington -
s�A7f10f WOASNIN���
IN THE MATTER OF AMENDING A
COMPREHENSIVE SIX YEAR RESOLUTION No. 14- ���CC
TRANSPORTATION IMPROVEMENT
PROGRAM FOR THE YEARS 2014-2019
WHEREAS, pursuant to the requirements of Section 6, Chapter 83,Laws of Extraordinary
Session of the State of Washington, Grant County did prepare a Comprehensive Transportation
Improvement Program for the ensuing six years; and
WHEREAS, priority array of projects prepared in accordance with County Road
Administration Board Standards of Good Practice (WAC 136-14) was made available and was consulted
by the Board during the preparation of the Six Year Program; and
WHEREAS, the Engineer's report with respect to deficient bridges was available to the
Board during the preparation of the Six Year Program;and
WHEREAS, an environmental pre-assessment of the Six Year Program indicated that the
social, economic and aesthetic values would not be disturbed; and
WHEREAS, pursuant further to said Law,the Board of County Commissioners, being the
legislative body of the County, did prepare,revise and extend said Six Year Program and did hold a public
hearing on said Comprehensive Plan at 2:00 p.m. at the Grant County Courthouse,Ephrata, Washington on
the 23'd day of July,2013.
NOW, THEREFORE BE IT RESOLVED by the Board of County Commissioners of
Grant County, Washington, that the Comprehensive Six Year Road Program presented at the public
hearing be amended as shown.
EFFECTIVE DATE: �e�'�, 2014.
DATED this ��day ofc_�f'° � , 2014.
�
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY,WASHINGTON
Yea Nay Abstain
� ❑ ❑
Ca larr Swartz, hair
�/ ❑ ❑ � ---- - -
R' ha St vens,Vic ir
� ❑ ❑
/ Cmdy Carter,Member
TTES .
C rk of th o
Page 1 of 1
Six Yeau�Transportation Improvement Program
From 2014 to 2019
qqency: Grant County
co.No.: 13 Co.Name: Grdnt County Heanng Date: Jury 23,20�3 Adoption Date: July23,2073
City No. --- MPO/RTPO= QUddCO Amend Date: Febn,ary ta,zo�a Resolution No.: 13- -CC
Pro'ect Identfication Project Costs in Thousands of Dollars Federally Funded
1 � � u, Expenditure Schedule (Local
R A Federal Aid No. B. Bridge No. � o� a � Fund Source Information A e� Projeds Only
° ��s C. ProjectTitle aEi � � �j a Federal Fundin g �� �
J
� v a Z D. Street/Road Name of Number Q � � 2� � Phase Federal Federal State 4th thru Envir Required
u- E. Beginning MP or road-Ending MP or road � � � 'o Start Fund Cost by Fund State Local Total 1 st 2nd 3rd 6th Type Date
F. Describe Workto be Done a (mm/dd/yy Code Phase Source Funds Funds Funds (mm/yy)
1 2 � 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2'I
PE 43 7 50 50?
S.FRONTAGE RD (2094 STPR Funding) RW
8 12 Rd.No_= 16720-Winchester Wasteway Vic.To Dodson Rd 03 S 2.74 p,T CN 476 74 550 550' CE No
From: MP'10.33 To: MP 13.07
2R,Surface(BS�,Finished Width 28 ft.
Total Pro"ect Cost $600,000 TOTALS STP R 519 81 600 600; 600
PE 17 3 20 20;
PATTON BLVD OVERLAY/INLAY (2094 STPR Funding) RW
14 15 Rd.No.: 45170-SR 17 to Mdrews(W/6cc) 07 S 2.02 p,T CN 545 85 630 630 j �E No
From: MP 0.00 To MP 1.60 From:MP 1.87 To:MP 229
Gnnd,Overlay,Inlay with HMA; Finisfied Width=48�0 Ft
Total Pro ect Cost $65Q000 TOTALS STP R 562 88 650 650I 650
`denotescarryoverforSTIP TOTALS 476 1081 169 1250 1250
DOT Form 140-049 Rev.9/95 Distribution:2 TransAid;TIB;CRAB;RTPO;Planning;PUD;Irrigation Districts;Telephone Compani