HomeMy WebLinkAboutResolution 07-058-CC/4a+.T � Z M1Ty
BOARD OF COUNTY COMMISSIONERS �..
Grant County, Washington
RESOLUTION No. 2007 - OS$- CC
In the Matter of Initiating a County Road Project Designated as
CRP 07-23c, Road L SW
WHEREAS, cost share contributions in the amount of $7,637 have been collected and the project has
been recommended for construction by the County Road Engineer.
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT Road L SW (0 800 miles south of Baseline
W to 1.050 miles south of Baseline W), State Road Log No. 17000, MP 5 610 to MP 5 860, be improved as
follows,
Grade, drain, surface (BST Class A). Finished width= 26 ft. (See attached vicinity map, x -section)
This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and
authorized to report and proceed thereon as by law provided (RCW 36.75 050, 36 80.030, 36 60 070)
BE IT FURTHER RESOLVED, that an appropriation fromthe officially adopted road fund budget and
based on the County Road Engineer's estimate is hereby made in the amounts and for the purposes shown:
PURPOSE
Engineering
Right of Way Acquisition
Subtotal (Not subject to RCW 36 77 065)
Construction
TOTAL
AMOUNT OF APPROPRIATION
County Forces Contract
$500
— 0
$500
$24,50
$25,000
(Check appropnate box)
E4' This protect is included in the officially adopted Annual Road Program as Item No 23
❑ This project is hereby made a part of the officially adopted Annual Road Program in accordance
with RCW 36 81 130.
BE IT FURTHER RESOLVED, that (Check appropnate box)
❑ The construction is to be accomplished by contract in accordance with RCW 36.77 020.
p' The construction is to be accomplished by county forces in accordance with RCW 36 77.065
and WAC 136-18
EFFECTIVE DATE: {7 ?JY 9 2007.
DATED this _ day of W 4 t 2 2007.
Yea/ Nay Abstain
li❑ ❑
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
IV' ❑ ❑
Page 1 of 1
ME
-
4 T 15
BAR
3 i24
1 21
-2 12 2' 211 19
2 2
22
8
j^-
25
is 29 1, 1
3 3
27
-5
7
Y a 135
(
32 3}
31 32 33
35
)
12 ol
16
G5 34
J5 JS T4—L"'
1% 3
1 1
To IT 2 is 09
LL2
is
T j
4 NW z
3 '4 9 20 21 I 2
2 302
26 25
39— 7
23
26
T
M 3
3� '5 3�
33 1 34
35 2 j� S FRONTAGE Rb-,—,
31 76
BAShl'NE W
:3
5 6 12
SUt"ND uz
-4 �3
03
T
ESTATE
15
06 35
12
.GEORGE
>
07 08
C9
�jtj�PROJEtT
'o - h .,%WI7 08
>
11 10
11 12 07 08
13 11 17
16 1511 13 Is
6 .5
m S 11t �s
03 -
To
-
1
14 3 1 5 1- '4 11 Is r-1
1 13 la 17
4 19 20
1 22 23;D
&0 22
230 N 19 1 21 o' 1 2. 2324 20
2
2%3
I 4--- 4SW
19 20
y w 29
-
m 2725 25
SSW
25 27
29 30
31, 29 28 1 2- 2e 25
280 �7
3236
la
26 25 1 3) 29
33 3 35 Ill"
32 a
34 35 I M 31 32
33
34
35 35 32
2
Z
0
04 9 03 02 Of 05 34 03
—r — —
01 35 .0 02 1,
`5
ot w
0)
0400 03
0 2 a, m
9E, �
ag 11 j 12 07
oq 09 10
illFR H
07AN
Q 1
I
m
Ill w
07
9 10
M 12
Is is 14 13 IS
;a . 5 •'
is
0 —
14 13 TS 1 3
Is 1 18 17
1
. ve.
3
U — I
r
21 22 23 I N 19
20 22
A.,' 21
2319
20
21 •
is
r
28 27 26 21 1
24
22 �i
22
23 20
30
L
29 1 -j 717—
28
25 10 26 9
—25 1 2 27 25 , 30
28
26
3334
1
7
30 '9
25
31
32 33 34
35- 1 32 63 35 w 31
33 . 34
35 3� 31 —
12
32
VAL
03 02 al 06
ol
05 64
03
3
is 03. 02
m r w 05
031
02
Oil 0b
09 10 11 12 1
-7
ry
1 12 a 09 IOYAqr 77
12
11. 12 077 08
FILL 51-OPE
OJT 5LOM
95'
5.51
FINISH FROM F GRADE
-251c
15.57. UA5e "A"
025' CRUSHED aKFACIW5 TOP COURSE
0.55' rR1r=,HEP 5LKFAC,1N6 BAH COURSE