HomeMy WebLinkAboutResolution 06-224-CCFiled for Record at the Request of the Grant County
Department of Public Works 124 Enterprise Street S E ,
Ephrata, Washington 98823
By
' ni
BOARD OF COUNTY COMMISSIONERS j 14 Grant County, Washington (f(i I
\ e ^� -
IN THE MATTER OF VACATING RESOLUTION NO.
PORTION OF A CERTAIN COUNTY ROAD INTENTION TO VACATE AND
RIGHT-OF-WAY NOTICE OF HEARING
WHEREAS, The Board of County Commissioners of Grant County, Washington, considered a
certain county road right-of-way useless, and by this resolution entered upon it's minutes, declared its
Intention to vacate and abandon a certain county road right-of-way described as follows
Legal Description: A PORTION OF THE RIGHT OF WAY OF ROAD 4 NE, IN SECTIONS 7 AND 18,
TOWNSHIP 19 NORTH, RANGE 28 EAST, W M, GRANT COUNTY WASHINGTON, MORE FJL--Y
DESCRIBED AS FOLLOWS
THAT PORTION OF THE ROAD 4 RIGHT OF WAY DEDICATED ON THE MOSES POINTE PHASE 1,
BLOCK 5A, FINAL P U D MAP RECOREDED IN BOOK 23 OF PLATS, PAGES 61-64, RECORDS OF
GRANT COUNTY, WASHINGTON, LYING EAST OF THE EAST RIGHT OF WAY LINE OF EDWARDS
DRIVE NE
See Attached Exhibits A and B
WHEREAS, the Board of County Commissioners has determined that consideration should be
given to vacating portions of certain County roads and right-of-way and directs the County Road Engineer to
prepare a report on said vacation and abandonment
NOW, THEREFORE, BE IT RESOLVED that a public hearing on the report and other related
matters shall be held In the Hearing Room of the Board of County Commissioners of Grant County,
Washington located In the County Courthouse, Ephrata, Washington at 2 30 PM, October 3rtl, 2006
DONE THIS -I<—DAY OF, 2006
Deborah Kay ore (Member)
Richard Stevens (Chair)
Zze!2
'LeRoy Alllso
Constituting the Board of County Commissioners
of Grant County, Washington
0 0
EXHIBIT A
ROAD 4 VACATION EAST OF EDWARDS
A PORTION OF THE RIGHT OF WAY OF ROAD 4 NE, IN SECTIONS 7
AND 18, TOWNSHIP 19 NORTH, RANGE 28 EAST, W.M., GRANT
COUNTY, WASHINGTON, MORE FULLY DESCRIBED AS FOLLOWS:
THAT PORTION OF THE ROAD 4 RIGHT OF WAY DEDICATED ON THE
MOSES POINTE PHASE 1, BLOCK 5A, FINAL P.U.D. MAP RECORDED IN
BOOK 23 OF PLATS, PAGES 61-64, RECORDS OF GRANT COUNTY,
WASHINGTON, LYING EAST OF THE EAST RIGHT OF WAY LINE OF
EDWARDS DRIVE NE.
J \DOCUMENT\1-06-078 Moses P[\Legal DescnpUon 1 doc
iz
EXHIBIT B
�0
32
10
D
L0CD m41
I EDWARDS WAY NE l_ --
_T
I < -o
D:0
00
D�
0 O
O c/)Z M
0
v
A
A
m
D
zz
0
f
v
s
o
WESTSHORE & RD 4 NE
COLUMBIA NORTHWEST
G f
o o'
RIGHT-OF-WAY REVISIONS
ENGINEERING, P S
z
7CN ENG.
- o
I
0,
n
o w
D
m m
n
FOR WESTSHORE HOLDINGS, LLC
PHILIP J BLOOM 321 5 8eecn, Sete A
r
rn
"'
m
m
{
Phone 766-1226 Moses lake WA 98837
m
<
4977 WESTSHORE OR NE, ML
k
c
�
�
�
,w
„-N
W
p�
\
$G$2
olC,
.0
mi<
_.
. ., .
<2/0 ,Mmx Mo ZKM
&&M
03\\]
#!;;
|%
}2\§
\[
=09mloEEEl;\)
_�,
]2
[ ,--
0o,;
/2m$
\L
3
ƒ
0-ƒ({0§2
§/
0 CD CD
n)§§
(
n
_,
,
#-u
CD
0 \/ƒ)r
2
°CD
i !
2■
C
_
2
= !
® }
=
g
k
_
-
0
«
'
>
$
-
(
3
_
•
%
2 �
/
Q
)
}
%
�
0
\
�
2
\
�
0
\�
§
;
Beverly Burke Overlay, CRP 05-05
Engineer's Estimate
Item No,
Total
Quantity
Unit
Item Description
Unit
Price
Total Amount
PREPARATION
1
100%
L S
Mobilization
$50,00000
$50,00000
2
100%
L.S
Notification
$50000
$50000
SURFACING
3
1,200
C Y
Maintenance Rock for Shoulder Slopes (From Stockpile)
$2300
$27,60000
HOT MIX ASPHALT
4
756
S Y
Planing Bituminous Pavement
$15 00
$11,340 0
5
30,150 00
Tons
HMA Class "1/2" Incl PG64-28 Paving Asphalt
$4500
$1,356,750.0
6
270
Tons
Asphalt for Tack Coat
$50000
$13,500 0
TRAFFIC
7
2,137
L F
Raise Beam Guardrail
$5.
$10,685 0
8
34,087
L F
Install & Remove Temporary Pavement Markings
$0.10
$3,408 7
9
12,872
L F
Painted Skip Centerline
$0.0
$643 6
10
16,734
L F
Painted Skip Centerline with No Pass
$008
$1,338.7
11
4,983
L F
Painted Double Yellow Centerline
$010
$49830
12
69,178
L F
Painted Edge Line
$007
$4,84246
13
100%
L S
Traffic Control
$30,00000
$30,00000
14
100%
L S
Spill Prevention, Control, and Countermeasure (SPCC) Plan
$500.00
$50000
OTHER ITEMS
15
20
Each
Adjust Monument Case
$25000
$5,00000
16
100%
L S
Trimming and Cleanup
$2,00001
$2,000 0
17
100%
L S
Minor Changes
$5,0000
$5,000 0
Contract Total $1,523,606.78
Hot Mix Asphalt Alternate A
161 22,650 1 Tons JHMA Class 1/2" incl P 64-28 Paving Asphalt $45 00 $1,019,250 0