Loading...
HomeMy WebLinkAboutResolution 05-226-CCBOARD OF COUNTY COMMISSIONERS Grant County, Washington I IN THE MATTER OF INITIATING COUNTY ROAD PROJECT DESIGNATED AS CRP NO. 05-04 Resolution No. 4S- Z Z � _ CC' WHEREAS, IT IS HEREBY RESOLVED THAT the E -SW , State Road Log No. 91010 from milepost 18.7 To Milepost 19.1 be improved as follows: Rebuild a two lane road due to awash out. The work will consist of reconstructing the road back to its original condition prior to the damage. The project will be approximately of 0.4 miles long. This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030,36.80.070) (Optional References) NOW,THEREFORE BE IT FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE AMOUNT OF APPROPRIATION Engineering $6,500 Right of Way Acquisition -0- TOTAL (Not Subject to 36.77.060) $6,500 Construction $77,000 TOTAL $83,500 (Check appropriate box) 0 This project is included in the officially adopted Annual Road Program as item No. X This project is hereby made a part of the officially adopted Annual Road Program in accordance with RCW 36.81.130 BE 1T FURTHER RESOLVED: (Check appropriate box) X The construction is to be accomplished by contract in accordance with RCW 36.81.130. El The contract is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18. �?.. err � 1 ADOPTED this Day of -'20 05— B 0 A R D 57 BOARD OF COUNTY COMMISSIONERS GRANT COUNTY, WASHINGTON Yea Nay Abstain �� LeRoy C. Allison,,Chair Cad ❑ ❑ ►per ❑ ❑ Kay Moors! *mber Richard Stevens, Member Constituting the Board of County Commissioners of Grant County, Washington