HomeMy WebLinkAboutResolution 05-228-CCo� CoU���
BOARD OF COUNTY COMMISSIONERS
Grant County, Washington
RESOLUTION No. 2005 -A?k- cc ��r�orr�swir�l4
In the Matter of Initiating a County Road Project Designated as
CRP 05-20b, Read 3.3 SE
WHEREAS, cost share contributions in the amount of $8,905 have been collected and the project has
been recommended for construction by the County Road Engineer.
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT Road 3.3 SE (U SE to Y2 mile east of U SE),
State Road Log No. 26210, MP 2.000 to MP 2.500, be improved as follows:
Grade, drain, surface (BST Class A). Finished width= 26 ft. (See attached vicinity map, x -section)
This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and
authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36,80.030, 36.60.070)
BE IT FURTHER RESOLVED, that an appropriation fromthe officially adopted road fund budget and
based on the County Road .Engineer's estimate is hereby made in the amounts and for the purposes shown:
PURPOSE
Engineering
Right of Way Acquisition
Subtotal (Not subject to RCW 36.77.065)
Construction
TOTAL
AMOUNT OF APPROPRIATION
County Forces Contract
$500
$0
$500
$35,500
$36,000
(Check appropriate box)
Io This project is included in the officially adopted Annual Road Program as Item No. 20.
❑ This project is hereby made a part of the officially adopted Annual Road Program in accordance
with RCW 36.81.130.
BE IT FURTHER RESOLVED, that: (Check appropriate box)
❑ The construction is to be accomplished by contract in accordance with RCW 36.77.020.
Rr The construction is to be accomplished by county forces in accordance with RCW 36.77.065
and WAC 136-18.
EFFECTIVE DATE: h�f� / -] 2005.
DATED this day of i , 2Q05.
Yea Nay Abstain
D El
A 4EST: I" ❑ Cl
Cl r
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
tr Pabe,1 of 1
t `
7
T 2C 4
T. 9
Coulee
+
r EEL& 14 la to
IS 1 Z. 23 2. Is !a 1 21 zz 23 14
17 is So 25 to I 2] I to 21 z? I as 23
NE
I
1.4 J$ ZV36 31
T iS N
11
m op x 18 N
liAi
'a 12 'a SE
13 Y 17
24 91 22 Z3 24 a 20 21 32 23- 2-
26 1 20 30hylsoas
10 33 It
is 34 is
T 18 N
to
2 Coulee T 17 N
3
LR
U
z
Lr
dq,
14
a a RDE llw�
Iva
,2 2, R
cw to 22 23 Z4
Jun
10
—21 age
20 T indmi`l a 30 25
Sia owe u• oil,
32 1' 14" 33 1 •32 3
0
JJ
12
VA T {7 N
227a ck M N C!.-bell
!� bell p U w x
13 Mo ;on Lyle
.1 - w U.) LU
;rah :n 0
14 0
p hroad
FILL SLOPE OUT SLOPE
5.5 4.51
FIN15H PROFILE 6RADE
-:2%
-L-5.57. CLAc.-r_-j "A
- —
G.25' CRUSHED SURFACING- TOP COUR5E
—0.55" CRUSHED SURFACING BASE COURSE