HomeMy WebLinkAboutResolution 01-002-CCGRANT COUNTY
BOARD OF COUNTY COMMISSIONERS
IN THE MATTER OF APPROVING
A TIME ONE YEAR EXTENSION FOR THE
COMPLETE FILING OF PHASE d
OF CRYSTAL SPRINGS, A PRELIMINARY
PLAT IN A PORTION OF SECTION I, TOWNSHIP
19 NORTH, RANGE 28 EAST, W.M., GRANT
COUNTY, WASHINGTON
RESOLUTI0N:_2n0t —n2 -CC
RESOLUTION APPROVING A
ONE (1) YEAR TIME EXTENSION
FOR THE FILING OF CRYSTAL
SPRINGS PHASE IV, A
PRELIMINARY PLAT.
GARY MORGAN
WHEREAS, the Grant County Board of County Commissioners have been advised by
the Grant County Planning Commission that a public hearing was conducted on November 1,
2000 on the matter of approving a one year time extension for the filing of the remaining 12 lots
in the Crystal Springs Preliminary Plat, in a portion of Section 1, Township 19 North, Range 28
East, W.M., Grant County, Washington;
WHEREAS, the Board of County Commissioners have given notice that this matter
would be considered at their regular meeting on November 21, 210001-
WHEREAS,
000;
WHEREAS, the Board of County Coin inissioners have upheld the findings,of fact of the
Grant County Planning Commission stating that the Developer has proven to the Grant County
Planning Commission that adequate reason cvists lbr a one year time extension to be granted for
complete filing of Crystal Springs;
NOW THEREFORE BE IT RESOLVED, that the Board of County Commissioners for
Grant County, Washington by this resolution. approve the one year time extension for the
complete filing of Crystal Springs Preliminary Plat located in a portion of Section 1, Township 19
North, Range 28 East, W.M., Grant County. Washington, subject to the conditions below:
1) Developer shall continue to meet any and all conditions as imposed upon him at the time the
Preliminary Plat of Crystal Springs was approv cd
2) Developer shall comply with all requirement, of the Grant County Health District, including
but not limited to the following:
a) Each lot must have a minimum of two (2) icst holes as part of the evaluation for septic
system suitability.
b) Final approval of the plat will not be given until a site evaluation report is submitted to
the Grant County Health District.
c) Site evaluation report must be completed by .i certified designer and/or a licensed
engineer.
3) The one-year time extension, if approved will end one year from the date the Board of
County Commissioners signs the resolution adopting the extension.
Done this 3rd _ day of January 200
ATTEST \ J'X 1 Z'
Grigg, Cl of the Board
DpbQrah.K. re, Chair of the Board
Tim nead, Commissioner
Lego Allison, Commissioner
< onstituting thr Board of County Commissioners
of ,rant County, Washington