Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution 01-079-CC
RESOLUTION NO._ 2001_79=C_C BEFORE THE BOARD OF COUNTY COMMISSIONERS of GRANT COUNTY, WASHINGTON In the matter of initiating County Road Project designated as CRP No. OI -24 IT IS HEREBY RESOLVED THAT the 3 NW Road. State Road Log No. 31200 from milepost 0.99 To Milepost 1.01 be improved as follows: Replacement of existing timber bridge ( Bridge # 390) with pre -stressed concrete. This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and authorized to report and proceed thereon as by law provided. (RCW 36 75.050, 36.80.030,36.80.070) (Optional References) IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purposes shown: PURPOSE Engineering Right of Way Acquisition TOTAL (Not Subject to 36.77.060) Construction TOTAL (Check appropriate box) 40,148 -0- 267,656_ AMOUNT OF APPROPRIATION 40,148 $307,804 ❑ This project is included in the officially adopted Annual Road Program as item No © This project is hereby made apart of the officially adopted Annual Road Program in accordance with RCW 36.81.130 IT IS FURTHER RESOLVED that (Check appropriate hox) IAJ The construction is to be accomplished by contract in accordance n ith PCW 3681 130 ❑ The contract is to be accomplished by county forces in accordapce with RCW 36 77.060 and WAC 136-18 ADOPTED this 28th Day of Maw2001 ATTEST: V Clerk a Board BO 1RD OF COUNTY COMMISSIONERS GK 'OU�V'rY WASHINGTON PIK ! ( _ I`eRoy Allison, Chairman h Moore, Commissioner Snead, Commissioner O c- rT-1 C7