HomeMy WebLinkAboutResolution 04-005-CCRESOLUTION NO. 0(-l-0C6-ClL
BEFORE THE BOARD OF COMMISSIONERS OF GRANT COUNTY, WASHINGTON
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be Improved as shown between the points Indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby and authorized to
report and proceed thereon as by law provided. (RCW 36 75 050, 36 80.030, 36.80.070)(Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown
(t)
(2)
(3)
(4)
(5)
(6)
(7)
(a)
(9)
I BRIDGE CONSTRUCTION
C
D
ROAD NAME AND/OR
ROAD
TYPE OF
N
Y
COST ESTIMATE (THOUSANDS)
Ann. Const
CRP
BRIDGE NUMBER
Log No
WORK
T
L
Const Prog.
No
MP TOMP
R
A
A
B
C
T
O
R
Engin Construction
ROW Federal
Local
(SEE CODE)
Item No
2 SW
16400
0.00
1.50
ABCD
X
X
$6
$174
17a
04-07
(Q SW TO 0.5 -SW)
DUNE LAKE/DESERT VIEWS/
21710
0.00
1.23
ABCD
X
X
$5
$146
17b
04-08
SUNDANCE RDS
(0 00 TO 1 23 )
S -NE
43750
0.00
2.49
ABCD
X
X
$12
$286
17c
04-09
(N FRONT TO END)
EVANS LANE
41590
0.00
0.24
ABCD
X
$2
$26
17d
04-10
(KONISHI TO END)
KULM
20880
0.00
2.46
ABCD
X
X
$9
$286
17e
04-11
(M12 -SE TO H SE)
SEAGULL RD
NEW
0.00
1.50
ABCD
X
X
$25
$275
18
04-12
(SR 28 TO DODSON)
U -NW & 5 -NW RDS.
93010
1407
22.91
E
X
$10
$660
19
04-13
(SR 28 TO SR 281)
STRATFORD RD.
94025
436
13.66
ABCD
X
X
$96 $1,204
$188
20
04-14
(TYNDALL TO BRIDGE #157)
BRIDGE #228,4 SE RD
21880
025
0.36
1
X
X
$12 122
31
25
04-15
(4) TYPE OF WORK CODE
A PRELIMINARY ENGINEERING
F CURBS 8 GUTTERS
B RIGHT-OF-WAY
G SIDEWALKS
C GRADING, DRAINING, SURFACING
H TRAFFIC FACILITIES
D LIGHTBIT SURF TREATMENT
I BRIDGE CONSTRUCTION
E A C OR PC C PAVEMENT J PATHS & TRAILS RCW 47 301
ADOPTED this day of
Jr
Yep Nay Abstain
T ST � ` � Q' ❑ El
67 ❑ ❑
C erk of the Board
(5) The construction is to be accomplished by contract
In accordance with RCW 36.77.020 at. seq.
(6) The construction is to be accomplished by county
forces In accordance with RCW 36 77.060 and WAC
136-18
❑ ❑ ❑
Recommended for use In the connection with WAC 136-18-030,
For Multiple Project Initiation
BOARD OF COMMISSIONERS OF
GRANT COUNTY, WASHINGTON
NplI . ER'