Loading...
HomeMy WebLinkAboutResolution 04-005-CCRESOLUTION NO. 0(-l-0C6-ClL BEFORE THE BOARD OF COMMISSIONERS OF GRANT COUNTY, WASHINGTON In the matter of initiating county road projects and assigning CRP numbers. IT IS HEREBY RESOLVED THAT the roads listed below be Improved as shown between the points Indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby and authorized to report and proceed thereon as by law provided. (RCW 36 75 050, 36 80.030, 36.80.070)(Optional References). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineer's estimates are hereby made in the amounts and for the purposes shown (t) (2) (3) (4) (5) (6) (7) (a) (9) I BRIDGE CONSTRUCTION C D ROAD NAME AND/OR ROAD TYPE OF N Y COST ESTIMATE (THOUSANDS) Ann. Const CRP BRIDGE NUMBER Log No WORK T L Const Prog. No MP TOMP R A A B C T O R Engin Construction ROW Federal Local (SEE CODE) Item No 2 SW 16400 0.00 1.50 ABCD X X $6 $174 17a 04-07 (Q SW TO 0.5 -SW) DUNE LAKE/DESERT VIEWS/ 21710 0.00 1.23 ABCD X X $5 $146 17b 04-08 SUNDANCE RDS (0 00 TO 1 23 ) S -NE 43750 0.00 2.49 ABCD X X $12 $286 17c 04-09 (N FRONT TO END) EVANS LANE 41590 0.00 0.24 ABCD X $2 $26 17d 04-10 (KONISHI TO END) KULM 20880 0.00 2.46 ABCD X X $9 $286 17e 04-11 (M12 -SE TO H SE) SEAGULL RD NEW 0.00 1.50 ABCD X X $25 $275 18 04-12 (SR 28 TO DODSON) U -NW & 5 -NW RDS. 93010 1407 22.91 E X $10 $660 19 04-13 (SR 28 TO SR 281) STRATFORD RD. 94025 436 13.66 ABCD X X $96 $1,204 $188 20 04-14 (TYNDALL TO BRIDGE #157) BRIDGE #228,4 SE RD 21880 025 0.36 1 X X $12 122 31 25 04-15 (4) TYPE OF WORK CODE A PRELIMINARY ENGINEERING F CURBS 8 GUTTERS B RIGHT-OF-WAY G SIDEWALKS C GRADING, DRAINING, SURFACING H TRAFFIC FACILITIES D LIGHTBIT SURF TREATMENT I BRIDGE CONSTRUCTION E A C OR PC C PAVEMENT J PATHS & TRAILS RCW 47 301 ADOPTED this day of Jr Yep Nay Abstain T ST � ` � Q' ❑ El 67 ❑ ❑ C erk of the Board (5) The construction is to be accomplished by contract In accordance with RCW 36.77.020 at. seq. (6) The construction is to be accomplished by county forces In accordance with RCW 36 77.060 and WAC 136-18 ❑ ❑ ❑ Recommended for use In the connection with WAC 136-18-030, For Multiple Project Initiation BOARD OF COMMISSIONERS OF GRANT COUNTY, WASHINGTON NplI . ER'