HomeMy WebLinkAboutResolution 03-031-CCRESOLUTION NO.
BEFORE THE BOARD OF COMMISSIONERS OF GRANT COUNTY, WASHINGTON
In the matter of initiating county road projects and assigning CRP numbers.
2003 -031 -CC
IT IS HEREBY RESOLVED THAT the roads listed below be Improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby and authorized to
report and proceed thereon as by law provided. (RCW 36.75 050, 36.80.030, 36.80.070)(Optional References).
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown:
(�)
(z)
(3)
(4)
(5)
(6)
(7)
(8)
(g)
c
o
ROAD NAME AND/OR
ROAD
TYPE OF
o
v
COST ESTIMATE (THOUSANDS)
Ann. Const.
CRP
BRIDGE NUMBER
Log No.
WORK
R
L
Const. Prog.
No.
M.P. TO M.P.
A
A
B
T
0
R
Engin. Construction
R O.W. Federal Local
(SEE CODE)
Item No.
BEVERLY-BURKE RD
91013
13.70
14.72
D
X
$10 $0 $110
17
03-01
FRENCHMAN HILL TO 7 SW
3 NE RD CHANNELIZATION
94000
1.66
2.15
ABD
X
$21
18
03-02
'SER TO L NE
3 NE RD
94000
1.62
4.91
D
X
$21 $0
19
03-03
WISER TO O NE
10 NE RD
NEW
0,00
0.50
ABC
X
$10
23
03-04
SR 17 TO NEPPEL
DOROTHY STREET
41970
0.31
0.52
ABC
X
$10
24a
03-05
MOON TO FAIRVIEW
(4) TYPE OF WORK CODE
A PRELIMINARY ENGINEERING
B RIGHT -OF -WAV
C GRADING, DRAINING, SURFACING
D LIGHTER SURF TREATMENT
E A C OR P C C PAVEMENT
F CURBS 8 GUTTERS
G SIDEWALKS
H TRAFFIC FACILITIES
I BRIDGE CONSTRUCTION
J PATHS 8 TRAILS RCW 47,301
ADOPTED this /l_�_dayof deC%
ATTEST
A&i.w
Clerk of the Board
(5) The construction Is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
136-18
Recommended for use in the connection with WAC 136-18-030,
For Multiple Project Initiation
BOARD OF COMMISSIONERS OF
GRANT COUNTY, WASHINGTON