Loading...
HomeMy WebLinkAboutResolution 03-031-CCRESOLUTION NO. BEFORE THE BOARD OF COMMISSIONERS OF GRANT COUNTY, WASHINGTON In the matter of initiating county road projects and assigning CRP numbers. 2003 -031 -CC IT IS HEREBY RESOLVED THAT the roads listed below be Improved as shown between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby and authorized to report and proceed thereon as by law provided. (RCW 36.75 050, 36.80.030, 36.80.070)(Optional References). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineer's estimates are hereby made in the amounts and for the purposes shown: (�) (z) (3) (4) (5) (6) (7) (8) (g) c o ROAD NAME AND/OR ROAD TYPE OF o v COST ESTIMATE (THOUSANDS) Ann. Const. CRP BRIDGE NUMBER Log No. WORK R L Const. Prog. No. M.P. TO M.P. A A B T 0 R Engin. Construction R O.W. Federal Local (SEE CODE) Item No. BEVERLY-BURKE RD 91013 13.70 14.72 D X $10 $0 $110 17 03-01 FRENCHMAN HILL TO 7 SW 3 NE RD CHANNELIZATION 94000 1.66 2.15 ABD X $21 18 03-02 'SER TO L NE 3 NE RD 94000 1.62 4.91 D X $21 $0 19 03-03 WISER TO O NE 10 NE RD NEW 0,00 0.50 ABC X $10 23 03-04 SR 17 TO NEPPEL DOROTHY STREET 41970 0.31 0.52 ABC X $10 24a 03-05 MOON TO FAIRVIEW (4) TYPE OF WORK CODE A PRELIMINARY ENGINEERING B RIGHT -OF -WAV C GRADING, DRAINING, SURFACING D LIGHTER SURF TREATMENT E A C OR P C C PAVEMENT F CURBS 8 GUTTERS G SIDEWALKS H TRAFFIC FACILITIES I BRIDGE CONSTRUCTION J PATHS 8 TRAILS RCW 47,301 ADOPTED this /l_�_dayof deC% ATTEST A&i.w Clerk of the Board (5) The construction Is to be accomplished by contract in accordance with RCW 36.77.020 et. seq. (6) The construction is to be accomplished by county forces in accordance with RCW 36.77.060 and WAC 136-18 Recommended for use in the connection with WAC 136-18-030, For Multiple Project Initiation BOARD OF COMMISSIONERS OF GRANT COUNTY, WASHINGTON