HomeMy WebLinkAboutResolution 03-060-CC�T cod
BOARD OF COUNTY COMMISSIONERS _
Grant County, Washington
RESOLUTION No. 2003 - QbD - CC
In the Matter of Initiating a County Road Project Designated as CRP 03-24d , 10.5 Rd. S.E.
WHEREAS, cost share contributions in the amount of $29,545.00 have been collected and the project
has been recommended for construction by the County Road Engineer
NOW, THEREFORE, BE IT HEREBY RESOLVED THAT the 10.5 Rd. S.E. (C Rd. S.E. to E Rd. S.E.),
State Road Log No. 20520, Milepost 1.070 to Milepost 3 150, be improved as follows:
Grade, drain, surface w/BST Class A. Finished width = 26 ft. (See attached vicinity map, x -section)
This project is hereby declared to be a public necessity and the County Road Engineer is hereby ordered and
authorized to report and proceed thereon as by law provided. (RCW 36.75.050, 36.80.030, 36.60.070)
BE IT FURTHER RESOLVED, that an appropriation fromthe officially adopted road fund budget and
based on the County Road Engineer's estimate is hereby made in the amounts and for the purposes shown:
PURPOSE
Engineering
Right of Way Acquisition
Subtotal (Not subject to RCW 36.77.065)
Construction
TOTAL
AMOUNT OF APPROPRIATION
County Forces Contract
$2,000
— 0
$2,000
$150,545
$152,545
(Check appropriate box)
R' This project is included in the officially adopted Annual Road Program as Item No. 24.
❑ This project is hereby made apart of the officially adopted Annual Road Program in accordance
with RCW 36 81.130.
BE IT FURTHER RESOLVED, that: (Check appropnate box)
❑ The construction is to be accomplished by contract in accordance with RCW 36.77.020.
R' The construction is to be accomplished by county forces in accordance with RCW 36.77.065
and WAC 136-18.
EFFECTIVE DATE: ( 2003
DATED this r – day of 2003
BOARD OF COUNTY COMMISSIONERS
GRANT COUNTY, WASHINGTON
Yea Nay Abstain
i / ❑ ❑
ATTEST: ❑ ❑
LeF
1� ❑ ❑
Clerk of the boArd Tim
Page 1 of 1
_ _ __
"X ,,. -.:
I
✓ ;Fal on Lb. r_
eu
' .'s1
a
e3
n
zo
e3
obs
< r
�
- n zo
I F
F
i{ if
I 30
xa I x,
30
z+
35NCA
32 5 {
333 no I I 1 3r 3n,
Si
).o
.-ia
`% 3
a
•.I 3s 3i
IRorifBioaJ^6_-g-
1
1 s
a
Hill. Al.
-
14 _ro
y
ir
ma
14 11
z
Sw
'It
L!
x
, x Y
S
dlllllt-
z5 z{
,r Eaf "�'xl
�"f
i
28 L, 21
x
xv
za z.
-
i
x{ :s
_ '^fsaaehmn
xx x3
�0
u
q v e • - n Ix J
bw LR/
_ _ __
"X ,,. -.:
I
✓ ;Fal on Lb. r_
CYYYAl
< r
�
I F
F
i{ if
I 30
35NCA
32 5 {
333 no I I 1 3r 3n,
Si
).o
.-ia
`% 3
a
•.I 3s 3i
IRorifBioaJ^6_-g-
1
1 s
a
Hill. Al.
-
14 _ro
y
ir
ma
14 11
z5 z{
„y
28 L, 21
x
xv
za z.
-
i
x{ :s
301" 29
�
xx x3
,. x, 1 3 t
...:�,•.....x.
nes( I
17 l
3s 3{
313x v
<o r �-���
az 33 w %`3{
T i 6 N
T 15 N
ZO NI
FILL SLOPE
CI
FINISH PROFILE GRADE
-2% -2%
8.5.T. CLASS "A"
0.25' CRU5HED SURFACING TOP COURSE
0.35' GRU5HED 5URFA6IN6 BASE COUR5E
GUT SLOPE
3.5' 4.5'
1.5'
I IIS